Search

Back to search result

Eiriksdal og Makkoren Kraftlag

Sustainability and green

Construction of two new power stations in rock to replace three, old power stations (total production of approx 340 GWh).

The work includes; 6 km tunnels of cross-section 20 to 36 sq.m., two power stations, intakes, two bridges, outlets and a portal building together with other river-preventive work.