Back to search result
Construction of the Pelplin bypass
The Pelplin bypass has joined country road No. 1 with the A-1 motorway, along the voivodeship road No. 229. The bypass, 4,3 km in length, starts with a roundabout in the suburbs on the side of the town of Rudno, then it turns into a viaduct (72 meter long) to pass over railway line and after that it continues as a bridge (80 meter long) over the Wierzyca river. The bypass ends with a roundabout outside the town. Two crossings with voivodeship road No. 230 and a local road heading for Klonówka have also been executed. A pedestrian-bicycle pavement will be realized alongside the whole length of the bypass.
Facts
Service: Construction
Mark segment: Roads, Civil, Bridges, Underground/tunnels, Water management
Start date: 2008
Completion date: 2010
Clients: Zarząd Dróg Wojewódzkich w Gdańsku, ul. Mostowa 11a, 80-778 Gdańsk
Country: Poland
City: Pelplin
Project status: Completed